National Hotline:18257295111

news

Product classification

Contact us

Enterprise name: changxing hengbao building materials co., LTD

Contact person: Mr. Shen

Telephone: 0572-6292707

Phone: 18257295111

Email address: duoer19@qq.com

Website: en.hengbaojc.cn

Address: didong temple, caogaowu village, lijiaxiang town, changxing county...


Instructions on the construction of square bricks

Your current location: Home >> News >> Industry news

Instructions on the construction of square bricks

Date of release:2018-08-23 Author: Click:

One. construction steps:


First. Material:

The varieties, specifications, colors, patterns and grades of square bricks shall meet the design requirements; The quality of the products shall meet the national standards for square bricks, with the product qualification certificate attached; Do not remove products that are missing corners, threshing, cracking or damaged. In the construction site is strictly prohibited in bulk, no moisture.

Auxiliary materials: cement, sand, water, etc.


Second. The tool:

Screen, window screen, wood trowel, iron trowel, small ash shovel, straight wood bar, level rule, ink bucket, figure eight by rule, support wire board, hardwood clapboard, broom, sprinkling kettle, nutcracker, wooden hammer, wire, big wire hammer, steel blade cutter, diamond cutter and mixing ash tools.


Two. Construction instructions:


The square brick


One, when unpacking, please identify product specifications, size, color, etc., the same product shop paste together, do not mix different products shop paste together (unless the conscious pursuit of a special effect).

Two, in the shop before the first test shop on the ground, according to the form of the shop to determine the way of laying bricks, brick surface if there is a pattern or directional pattern, should be the product according to the direction of the illustration shop paste, for the best effect; Will color number, the square brick with different size divisional good kind, try mark mark, after using same color number or size, just can use adjacent color number and size.

Three, When pre-paving, pull two mutually perpendicular limits on the processed ground and adjust the level with a horizontal ruler.

Four, Clean up the site and sprinkle appropriate amount of water for construction; It is recommended to mix 325# cement and sand into mortar in a ratio of 1:3 (it is better to mix mortar no more than 200#, otherwise the mortar label is too high, resulting in uneven solidification shrinkage stress in the later stage).

Five, square brick according to the design size of the line, the line should be reserved between the seam, the seam is generally 5mm-12mm advisable.

Six, shop paste should be in the base of the coagulation, in the process of shop paste application hand gently push, so that the brick bottom and shop veneer balance, easy to discharge bubbles, and then knock the brick surface with wooden hammer, so that the brick bottom can eat pulp, so as not to produce empty drum phenomenon; Knock the brick surface smooth with a wooden hammer and measure it with a level ruler to ensure the level of the square brick paving.

Seven, side shop stick, side tick seam, with cement mortar tick seam, also can add color additives tick seam according to the needs. The general interstitching width is 5-12mm and the depth is 2mm. The solid base and full jointing can make the square bricks more durable and avoid falling off and breaking during use.

Eight. In the process of construction, sprinkle the chaff evenly on the shop veneer in time, sweep with a broom, wipe away the cement or other sticky dirt left on the brick surface, so as to avoid the surface from being contaminated for too long and difficult to clean.

Nine, after 12 hours, should be hit brick surface inspection, if you hear the "empty" voice, that is empty drum, should be re-shop stick.

Ten, brick shop after 24 hours can walk, scrub. Mix cleaner with clear water, clean square brick thoroughly, beautiful square appears in front of you.

Eleven, the winter cold stage can't construction, when the temperature is below 5 ℃, should add antifreeze in cement mortar, careless spread up after construction brick insulation, promote cement hardening.

Twelve, After the construction of square bricks, water should be sprayed for maintenance to promote the solidification of cement mortar and square bricks. Generally, the square bricks can be normally used after maintenance for 15 days.


The address of this article:http://en.hengbaojc.cn/news/412.html

Key word:Thesquarebrick,Squarebrickconstructionsteps,Floortileshopisstuck

Recently browse:

EASY NAV

EASY NAV

Home         About   

Products    Cases  

Brand         News  

Contact      Message

contact us

contact us

Contact person: Mr. Shen

Mobile phone number: 18257295111

Landline number: 0572-6292707

Website: en.hengbaojc.cn

Company address: didong temple, caogaowu village, lijiaxiang town, changxing county...

contact us

contact us
  

 Scan, WeChat consulting
Please leave a message for us
Please input the message here, and we will contact you.
name
name
Tel
Tel
mailbox
mailbox
add
add